Type signal wrapTransaction and remove @ts-expect-error
cancelledAgent: carson-engineer
Priority: 1
Branch:
kai/signal-wrapTransaction-typePR: #10499
Linear: ALL-886
Follow-up from domains/signal DeepSource sweep. Report: memory/2026-05-13-deepsource-sweep-domains-signal.md. Linear: https://linear.app/texture/issue/ALL-886/deepsource-register-domainssignal-remove-lone-ts-suppression. Remove the lone production TypeScript suppression in domains/signal/src/common/db.ts by replacing fn: (_) => Promise<T> with a safe explicit transaction callback type, likely (tx: PrismaClientTx) => Promise<T>. Validate with the signal domain tests/typecheck because Prisma transaction callback typing can be finicky. One PR-sized Tier-1 cleanup task.
Event Timeline
created
status_change
queued → in_progress
failed
lease expired — re-queued for retry
in_progress → queued
status_change
queued → in_progress
progress
Resumed task. Verified work was already implemented on branch kai/signal-wrapTransaction-type (commit ba03253e10) and shipped as PR #10499. Diff matches memory report exactly: removed @ts-expect-error, typed callback as (tx: PrismaClientTx) => Promise<T>. CI: 5 SUCCESS / 2 SKIPPED / 0 failures. PR awaiting CODEOWNER review.
failed
lease expired — re-queued for retry
in_progress → queued
progress
Orchestrator confirmed sub-agent shipped PR; CI green; awaiting CODEOWNER. active-ci-watch.env updated. Subject to ping-once rule.
progress
2026-05-13 ~14:00 UTC heartbeat verification: PR CI still green, MERGEABLE, BLOCKED on REVIEW_REQUIRED. CODEOWNERS has no rule for domains/signal — gate is repo-wide branch protection. No code action; ping-once back-off active until 2026-05-15.
status_change
queued → blocked
progress
2026-05-14 02:54 UTC heartbeat verification: PR #10499 re-checked. CI fully green (5 SUCCESS / 2 SKIPPED — build/test/shadow-check/CodeRabbit/Cursor Bugbot all pass). mergeable=MERGEABLE, mergeStateStatus=BLOCKED on REVIEW_REQUIRED, 0 reviews. No CODEOWNER for domains/signal. Moved task to blocked (monitoring) with ping_backoff_until=2026-05-15. No code action needed.
progress
2026-05-16 21:10 UTC ping-wave gate-block: CHECKLIST-CONTACT.md Gates 2/3/5/6 BLOCKED a repeat ping wave on Victor-pending PRs. The 2026-05-15 13:00 UTC back-off expiry was acted on at 2026-05-15 13:10 UTC (one nudge per PR posted). The 'back-off expiry' is not a Gate 2 material event by itself; PRs are still REVIEW_REQUIRED for the same reason as last heartbeat. Re-pinging again ~32h later would repeat the 2026-05-08 #9886 failure mode (3 pings in one UTC day). Recorded as NO_REPLY across all 5 PRs (#10401, #10498, #10499, #9886, #9932). Right venue for next escalation = DM Carson with a decision-options brief, not another PR comment.
status_change
blocked → cancelled