ALL-713: Migration Contract page + warm-gray→gray rename
completedPR #9885. Legacy→new forwarding map page at /foundations/migration. Post-Nick-review rename: dropped warm- prefix on gray primitive ramp (one ramp, one name). 7 files, +61/-72. CI watch active in active-ci-watch.env. Work is being handed off to a colleague for WIP continuation.
Event Timeline
created
status_change
in_progress → completed
progress
Visual verification section shipped (29f4d0a). Side-by-side swatch strip with CIE ΔE 2000 per row. 152 identical / 8 close / 83 shift / 2 manual — so review surface cut from 245 rows to 91. Math verified against all 34 Sharma reference pairs.